Thursday, October 15, 2009
PUNCHES in Bed for the Winter
I completed getting the boat winterized and now the cover is on. The whole process takes about 3 weeks. Everything with water such as tanks, engines, heads must be filled with antifreeze. We had great weather for the past two weeks and I was able to strip and refinish the rubrails on the boat. My bottom paint is not looking so great so in the spring Iwill have to decide if I want to strip the bottom all the way down.
I completed getting the boat winterized and now the cover is on. The whole process takes about 3 weeks. Everything with water such as tanks, engines, heads must be filled with antifreeze. We had great weather for the past two weeks and I was able to strip and refinish the rubrails on the boat. My bottom paint is not looking so great so in the spring Iwill have to decide if I want to strip the bottom all the way down.